OUR WORK
 

Facility Pre-Planning*

Merge Two Facilities into One. An aerospace manufacturing company had two facilities located 15 miles apart. The two facilities were merged into one new facility while accommodating revenue growth of 100%. Impact. Proper planning helped the client avoid signing a lease for a facility that would be too small before they even moved in.

Facility Modifications. A manufacturing facility needed to expand. The special manufacturing required controlled environments which were costly and required a long lead time. Impact. Facility pre-planning helped avoid a costly move that was unnecessary.

Merge Three Facilities into One on Fast-Track. Following a merger, combining company operations quickly was essential for its success. It was decided that a fast-tract building was the best approach. Through close teamwork between the company project manager, developer, general contractor and architect, facility was completed within 6 months of breaking ground while the design of the facility was completed just-in-time throughout construction.

Manufacturing System Planning and Architecture*

High Speed Manufacturing System
. Lead Project Manager and Sub-Team Sponsor for the development of a very high speed agile manufacturing system for assembling batteries. This project required concurrent development of a new manufacturing workcell, a new machinery architecture (patents US6325198, WO000416A2), a new control system with open architecture hardware and software, and 6 new manufacturing processes designed to support product design evolution. Total project responsibility was multi-million dollar over several years. Demonstrated essential functionality with a pilot scale installation of the actual production design. Impact. Enabled the manufacture of next generation product with increased quality (Cpk > 2 or six sigma) and reduced costs.

Agile Manufacturing System. Joint project with Case Western Reserve University to develop a pallet based robotic workcell. System was configured initially to assemble flashlights. Impact. Developed key manufacturing technologies for agile, flexible, and modular workcells.

High Speed Robotic Palletizing System. Led project to develop a servo motor driven high speed gantry robot for palletizing and depalletizing product trays. Commercially available robots were too slow and too expensive to justify capital investment based on labor savings. Impact. Reduced labor. Flexible system is a safe capital investment that has been redeployed by reconfiguring to new applications as factories closed.

* Note: This experience includes work done as SMI and in former positions at Fortune 500 companies.

 

 
 